Training Overview
Being able to decode control specifications
      
                                                                                        - Be able to develop the control range of a major series of production room
 - Being able to implement the control means
 - Be able to use the test results
 
                                                    Duration of the training: 
             Days
                                                
                                                                                                                                    
                                         
                                    3
      Technicians : Study, method, or quality control
      
                                        Analysis of the assembly plane or assembly
      
                                        - The identification of specifications to control
 - The controls using a profile projector
 - The controls using a roughness
 - The controls using a CMM (Three-Dimensional Measuring Machine)
 - The interpretation of the test results:
 - The determination of non-conformities
 

                
    


                                            
    




